Case Study · Manufacturing / Food & Drink

Rye River Brewing: 52% faster inventory cycle

An employee-led Lean project transformed finished goods inventory management — eliminating €23,400 in annual waste and achieving 93% racking accuracy.

IndustryManufacturing / Brewing
ProgrammeLean Practitioner
LocationCelbridge, Co. Kildare
52%Reduction in average inventory cycle time
93%Improvement in racking board accuracy
€23.4kAnnual waste eliminated from operations
The problem

Inventory records didn’t match reality

An employee at Rye River Brewing saw that book stock didn’t match the physical stock on the premises, and the physical stock didn’t match the racking boards. Unauthorised personnel were moving stock, and reconciling book to physical stock was time-consuming.

The result was unfulfilled customer orders and lost sales. She calculated the company was wasting approximately €23,400 a year (10–15 hours a week, at average costs of €300–450).

Rye River Brewing Lean project with LeanTeams
The journey

From mismatched records to measurable accuracy

Challenge

What the team set out to do

  • Increase the accuracy of the racking board to 95%
  • Improve traceability of the products
  • Save time on stock reconciliation
  • Increase book stock record accuracy
Solution

What they changed

  • Updated the QC template with a count check space
  • Introduced lot numbers and BBE dates on aisle sheets
  • Redesigned record pages on domestic boards
  • Changed counting to only after production finishes
  • One open half-pallet per product at a time
  • Trained staff on the picking process and stock movement
  • Introduced weekly floor meetings
Our approach

The 8-Step Problem-Solving Process

Problem

Defined the inventory mismatch and its impact — lost sales, wasted time, inaccurate records.

Current State

Mapped the inventory cycle end to end, documenting where records diverged.

Target

95% racking accuracy and reduced reconciliation time.

Root Cause

Identified through brainstorming, prioritised with an Impact/Ease chart.

Countermeasures

Grouped into Just Do It, Why Not?, Projects and Not Now.

Implementation

Changes rolled out across QC, racking boards, counting and training.

Evaluation

52% cycle time reduction and 93% racking accuracy achieved.

Standardisation

New processes standardised and learnings documented across the brewery.

Key outcomes

52% faster cycle, 93% racking accuracy

QC template updated.

Count check space added to the QC page.

One half-pallet per product.

No more than one open pallet per product.

Lot numbers on aisle sheets.

Lot numbers and BBE dates introduced.

Redesigned record pages.

Space for date and count when cases are removed.

Counting after production.

Stock counted only when production is finished.

Authorised stock movement.

Staff trained on picking and authorised movement, with weekly floor meetings.

Learnings
  • Incorrect records and mistakes lead to time wasted.
  • Culture change takes time and persistence.
  • Team effort was essential to achieve a good result.
  • Communication helped discover the source of problems and develop solutions.

“Our mission is to make great beer. We strive to make every drop of it just as good as the last.”

— Rye River Brewing Company
Conclusion

The expertise already exists inside your organisation

The employee closest to the stock saw the problem and led the fix. Through employee-led Lean projects, Rye River Brewing has made continuous improvements across the brewery.

Lean tools used

8-Step Problem SolvingBrainstormingImpact/Ease Chart
Ready to start?

Get results like Rye River

Practical Lean training that helps teams reduce waste, improve processes and measure the results.

Explore training programmes →

Not sure where to start? Book a 15-minute call