Case Study · Pharmaceutical

Tosara Pharma: Second label applicator removes roll-change downtime

One label applicator meant the line stopped for 3 minutes every 18–22 minutes to change rolls. A team member's proposal for a second applicator removed that downtime, with no extra training needed.

IndustryPharmaceutical / Consumer Healthcare
ProgrammeLean Practitioner
LocationBaldoyle, Dublin
1 → 2Label applicators on the line
3 minRoll-change stop removed
ZeroExtra operator training needed
The problem

The line stopped every time a label roll ran out

The assembly line had one label applicator using rolls of 3,000 single labels. A roll lasted 18–22 minutes, and each roll change took 3 minutes — downtime repeated throughout every shift.

Tosara Pharma Lean project with LeanTeams
The journey

From one applicator to continuous running

Challenge

What the team set out to do

  • Minimise the number of label roll changes on the line
  • Reduce downtime caused by changing rolls
Solution

What they changed

  • A team member proposed a second label applicator for one of the main lines
  • The team applied Kaizen, SMED, Kanban, Value Stream Mapping and 5S
  • A second applicator was installed so labelling runs continuously
Our approach

The 8-Step Problem-Solving Process

Problem

Line stopped for every label roll change.

Current State

3,000-label rolls lasting 18–22 minutes; 3 minutes per change.

Target

Remove label-change downtime from the line.

Root Cause

A single applicator meant every roll change stopped the line.

Countermeasures

Second label applicator on one of the main lines.

Implementation

Applicator installed with an identical roll holder.

Evaluation

Downtime from label changes eliminated; production increased.

Standardisation

No change to operator training or Line Clearance.

Key outcomes

Continuous labelling, no roll-change stops

Roll-change downtime removed.

The applicator now runs continuously.

Faster batch completion.

Batch filling and packaging operations are completed more quickly.

No extra training.

The roll holder is identical, so operators needed no additional training.

No impact on Line Clearance.

The change fitted existing procedures.

“Soothing families since 1931”

— Tosara Pharma
Conclusion

The expertise already exists inside your organisation

A team member questioned a 3-minute stop that came round every 18–22 minutes, and a simple equipment change removed it. Through employee-led Lean projects, Tosara Pharma has made continuous improvements across the business.

Lean tools used

KaizenSMEDKanban5S
Ready to start?

Get results like Tosara Pharma

Practical Lean training that helps teams reduce waste, improve processes and measure the results.

Explore training programmes →

Not sure where to start? Book a 15-minute call